Paradigme

160zip: Jb

: Lift the poker out slowly while it is still vibrating. This allows the concrete to flow back into the hole left by the tip. Maintenance :

: Always wash the poker head and the rubber-coated shaft with water immediately after use. Once concrete hardens on the equipment, it is difficult to remove and can cause overheating. Jb 160zip

: Connect the flexible shaft to the drive unit (vibrator motor). Ensure the coupling is secure and locked. The shaft is typically 4 meters long, allowing for significant reach. : Lift the poker out slowly while it is still vibrating

: Hold the head in the concrete for roughly 5–15 seconds until the surface around the poker becomes shiny and air bubbles stop rising. Once concrete hardens on the equipment, it is

: Lower the poker head (the 45mm metal tip) vertically into the concrete. Avoid dragging it horizontally through the mix, as this can create "tracks" or uneven density.